Challenges Met

  • Design Qualification of large distillation column using COMPRESS ®, as shown to the left

  • Hanger Failure Assessment - piping movement analysis, hanger redesign, equipment nozzle load minimization

  • Design Review and Approval of API-650 External Floating Roofs for Manufacturer

  • Bolted Flange joint and gasket design and qualification

  • Modified Zick Analysis for horizontal tank on three saddle supports